架空地板又叫做耗散型静电地板,是用支架、横梁、面板组装而成的一种地板,地面和地板之间就有一定的悬空空间,可以用来走线及送风等,当架空地板接地或连接到任何较低电位点时,使电荷能够耗散,电阻在105——109Ω为特征,在计算机机房、数据机房等线路众多的机房是相当实用的.那么它都有哪些种类的呢?很多人都不是特别了解架空地板,它该如何安装呢?山东塑胶地板的小编就来为大家介绍下架空地板的具体安装流程.
The floor is also called dissipative static floor, a floor frame, beam, panel assembly, there is a vacant space between the floor and the floor, can be used to walk the line and air, when the overhead floor grounding or connection to any lower potential point, the charge can be dissipated in 105 - 109, the resistance characteristics in the computer room, data rooms in many lines of the room is very practical. It is what kind of? Many people are not particularly elevated floors, how to install it? Shandong plastic floor of small series to introduce the specific installation process under the floor.
架空地板种类
Type of overhead flooring
1、合金钢架空地板
1, alloy steel overhead floor
合金钢架空地板改进以往的工艺,合金钢架空地板在冲压和焊接后都必须进行整形处理,保证了地板外形尺寸和足够的表面平整度.选用足够厚度的优质钢板,经800吨压机垂直拉伸,合金钢架空地板一次性整体成形尤其边角成形结构好,并以高强度发泡水泥填充,使得地板角落坚硬无比,具有特强的承载性能,并有效传导到支撑系统上.
Alloy steel floor improvement of old technology, alloy steel overhead floor must be reshaped in stamping and welding, the surface of the floor size accurate and sufficient smoothness. Quality steel plate with enough thickness, by 800 ton vertical tensile alloy steel floor integral forming especially corner forming structure and, with high strength foam cement filling, the floor corner hard, has a strong bearing capacity, and effective transfer to the support system.
2、铝合金架空地板
2, aluminum alloy overhead flooring
铝合金架空地板是以绿色、环保、可回收的理念和承载能力高进行产品设计制造,发明出美丽、健康、温馨的工作空间.
The aluminum alloy overhead floor is designed, manufactured by green, environmental protection, recyclable concept and high carrying capacity. It creates beautiful, healthy and warm workspace.
3、硫酸钙架空地板
3, calcium sulphate overhead floor
这是一种新型的架空地板.无甲醛污染物释放,强度高、平整、水浸泡不变形、隔音、保温、阻燃等特点,装饰面层根据用户的喜好和应用可有很多选择,可随时轻易搬移至新处所,完全符合经济效益.硫酸钙地板采用未经漂白的植物作为加固材料,结合凝固成的硫酸钙晶体,并经过脉冲压制工序制作而成.
这是一种新型的架空地板.无甲醛污染物释放,强度高、平整、水浸泡不变形、隔音、保温、阻燃等特点,装饰面层根据用户的喜好和应用可有很多选择,可随时轻易搬移至新处所,完全符合经济效益.硫酸钙地板采用未经漂白的植物作为加固材料,结合凝固成的硫酸钙晶体,并经过脉冲压制工序制作而成.
架空地板安装方法
Installation method of overhead floor
1、地面施工→放线→地面除尘→安装柱脚→调平(机电配合插座等)→安装面板→分项验收.
1, ground construction and line to ground to dust, leveling (mechanical and electrical installation of column with socket, etc.), installation panel sub acceptance.
2、放线:在要铺设架高地板的地面上,根据架高地板的排板图和现场的轴线位置,放出架高地板的地面分格线.
2, placing the line: in the ground to be laid on a high floor, the ground division line of the high floor is released according to the platoon chart of the high floor and the position of the axis.
3、基层修补:在排板横竖线交叉位置,即安装底座(支撑脚座)的位置处, 为达到满意的支撑效果,可将底层地板磨平或进行填补.
3, patching: in the horizontal and vertical line crossing row plate position, the mounting base (supporting base) position, to support a satisfying effect, can be smooth or fill the bottom floor.
4、基层清理:地面除尘,在开始安装前,用真空吸尘器将底层地面上的所有灰尘、土和施工碎片,全部干净.
4, grass-roots cleaning: ground dust removal, before the start of the installation, with a vacuum cleaner on the ground floor of all dust, soil and construction debris, all clean.
5、安装支承脚:用粘接剂抹在支撑杆的底座上,并用锚固螺栓将地板支撑脚牢固的安装在底层地板上.
5, install support foot: apply adhesive on the base of support rod, and anchor the floor support foot firmly on the floor floor with anchorage bolt.
6、调整支撑脚标高:根据地面标高情况,调整支撑脚的高度,采用拧螺纹、套等部分进行升高或降低,达到标高要求,调整好后,在螺纹(或铝柱上)加一个调平螺母和带有防震动移位的调平螺母.
6, adjust the supporting foot elevation: adjust the height of the supporting foot according to the height of the ground, use the screw thread, sleeve and other parts to increase or decrease to meet the requirement of elevation. After adjusting, add a leveling nut on the threaded (or aluminum column) and a leveling nut with anti vibration displacement.
7、饰面板安装:在板面组装四周要画线,使其连接适配,板面与垂直面相接处的缝隙不大于3mm.用便携式抬高器具铺设面板,随安随用真空吸尘器清理(包括所安面板、支座的背正面)半块板的切割不要在正在施工的房间内.
7, the decorative panel installed around the board to draw the assembly line, connecting the adapter plate and the vertical surface on the connecting part of the gap is not greater than 3mm. with a portable instrument panel with an elevation laying, with the use of vacuum cleaner comprehensive clean-up (including security on the front panel, support plates do not cut half) the room is under construction.
8、清理和饰面保护:铺设后的地面,用真空吸尘器清扫,然后报验收,经检查合格后,用塑料布覆盖严密,防止灰尘的进入和被其他施工人员破坏.
8, cleaning and finishing protection: after the laying of the ground, vacuum cleaner is used for sweeping. Then it is checked and accepted. After inspection is qualified, it is covered with plastic cloth to prevent dust from entering and destroyed by other construction personnel.